The project - to build a 100 foot boundary wall. Engineering brick was used to maximize longevity. The pillar was constructed. The wall was built 4 bricks high ready for coping. Facing bricks were then used to finish the top of the wall. The wall was built level as opposed to following the contour of the pavement for aesthetic purposes. This image shows the scale of the wall.
|